Skip to main content
  • PES
    Members: Free
    IEEE Members: Free
    Non-members: Free
    Pages/Slides: 55
Panel Session 29 Jul 2016

An overview of the need for modeling the end-user in CPS-based simulation studies in power engineering Including consumer asset models in power systems analysis Scheduling and controlling building power consumption to provide ancillary services

Tags:

More Like This

  • PES
    Members: $150.00
    IEEE Members: $250.00
    Non-members: $450.00
  • PES
    Members: Free
    IEEE Members: $10.00
    Non-members: $20.00