Skip to main content
  • PES
    Members: Free
    IEEE Members: $10.00
    Non-members: $20.00
    Pages/Slides: 81
05 Aug 2015

Installation of Synchronous Condensers for reliable HVDC operation and bulk power transfer AC Interconnection between Longitudinal Power System - The Chilean Case A system for real-time assessment and short-term forecast of operational limits in the Slovenian transmission network Greenfield eLNG-Concept for Australia Delivering energy through the world longest submarine HV AC cable

Chairs:
Uros Kerin
Primary Committee:
Energy Development and Power Generation
Sponsor Committees:
Energy Development and Power Generation
Tags:

More Like This

  • PES
    Members: $150.00
    IEEE Members: $250.00
    Non-members: $450.00
  • PES
    Members: Free
    IEEE Members: $10.00
    Non-members: $20.00