Skip to main content
  • PES
    Members: Free
    IEEE Members: $25.00
    Non-members: $40.00
    Pages/Slides: 19
20 Jun 2016

Presentation Topics:

Myths:
? Negative effects of performance testing
? Equalizing a VLA battery before a test
? Equalizing a VRLA battery prior to a performance test

Misunderstandings that Lead to Mistakes:
? Test termination at 100% capacity
? Failure to bypass weak cells
? Load bank cable sizing
? Test termination at first cell final voltage
? High rates on small connectors

Chairs:
Curtis Ashton
Primary Committee:
Energy Storage and Stationary Battery Committee (ESSB)
Sponsor Committees:
Energy Storage and Stationary Battery Committee (ESSB)

More Like This

  • PES
    Members: Free
    IEEE Members: $45.00
    Non-members: $70.00
  • PES
    Members: Free
    IEEE Members: $11.00
    Non-members: $15.00
  • PES
    Members: Free
    IEEE Members: $11.00
    Non-members: $15.00