The Use of Life Cycle Cost Analysis to Determine the Most Effective Cost of Installation of 500 kV Java-Sumatra Power Interconnection System

The Use of Life Cycle Cost Analysis to Determine the Most Effective Cost of Installation of 500 kV Java-Sumatra Power Interconnection System
Posted: 9 Dec 2016
Authors:
Herry Nugraha, Zivion Silalahi, Ngapuli Sinisuka
Pages: 7

Pricing:
PES Members: Free
IEEE Members: Free
Non-members: Free
Please sign in at the top of the page. If you are not an IEEE member, please create a free account to make a purchase or become a society member to have access to all materials for free.